Pre-construction:

Transparent and Accurate

We are not just a builder, we are your collaborative partner. Our team drives the entire process from project conception through groundbreaking. We combine a deep database of relevant projects with competitive, quality focused subcontractor partners to provide accurate budget numbers that will stand through the entire project. Clients appreciate our open-book, transparent approach. Sound decisions are made based on current and relevant data – that’s a Paradigm Difference.

Scheduling:

Begin with the End in Mind

Our professionals employ comprehensive scheduling – analyzing site constraints, phasing requirements, product lead-times, productivity and manpower requirements, and constructability efficiencies. We consider every detail, constantly update, recover as necessary, and communicate with project stakeholders at every step. We give high confidence that a client can move-in when expected – that’s a Paradigm Difference.

Safety:

Commitment -Zero Tolerance

Every day we commit to take care of the Paradigm family. By extension, this family includes the client, the design team, Paradigm professionals, and our subcontractor partners. The plan is comprehensive and flexible, specific for each project. We coach and teach through site training, task planning, and daily inspections. Enforcement includes stop work, retraining and resequencing, and removal if necessary. All Paradigm family members go home safe every day – that’s a Paradigm Difference.

Post-Construction

Beyond The Warranty

Your project is not complete until every last detail is closed. Services include: O & M manual development, As-built documentation, coordination of FF&E delivery and installation, and Warranty management. While manufacturers honor their products through a warranty date, our commitment to your project goes beyond contractual requirements. We stand behind each and every project and if something is not right, we will fix it – that’s a Paradigm Difference.

Delivery Methods:

Client Specific and Flexible

Paradigm prides itself in creating a custom approach to achieve a client’s goals. That includes the contract method for execution. Discussing the project requirements and constraints early on allows for the best alignment of the contract method to the best interest of all stakeholders. Paradigm has experience with multiple delivery methods including:

CMAR

Construction Manager at Risk (CMAR) is a delivery method in which the owner selects a builder early in the process to partner with all stakeholders from design through construction and beyond. This approach commits the Construction Manager to deliver a project within a Guaranteed Maximum Price (GMP) and schedule based on a set of construction documents and specifications.

DESIGN BUILD

Design-build is a delivery method that combines the design team and general contractor, making one single point of contact and accountability, allowing for more effective communication and collaboration between team members, creating value, and building relationships.

COST PLUS

The cost-plus construction delivery method is a contract agreement where the owner pays the actual cost of construction plus a predetermined fee to the contractor.